Multi-Axis CNC Machining. Fast. Affordable. Complex.

When standard shops say "impossible" or "8-week lead time"—we deliver. Tackle the most challenging geometries at competitive pricing.

Last Updated: December 16, 2025

⚡ SPEED ADVANTAGE: Cut Lead Times by 50%

Standard Industry Timeline vs. Our Delivery:

Part Complexity Industry Standard Our Turnaround
Simple 3-axis parts 2-3 weeks 3-5 days
Complex 5-axis components 6-8 weeks 10-14 days
Prototype to production 3-4 months 6-8 weeks

How We Achieve This:

  • 24/7 Lights-Out Machining — Automated pallet systems run unattended overnight
  • Parallel Processing — Multiple CNC centers tackle different operations simultaneously
  • Pre-Programmed Toolpaths — 80% of common geometries already optimized in our CAM library
  • Emergency Rush Service — 48-72 hour expedited production available

Real Case: Automotive client needed 200 transmission brackets. Quoted 4 weeks elsewhere—we delivered in 9 days with full CMM reports.

💰 COST ADVANTAGE: 20-35% Below Market Rates

Why We're More Affordable:

🔹 Integrated Turn-Mill Operations

Eliminate outsourcing costs—saves $15-40 per part

🔹 Optimized Material Utilization

Reduce material waste by 25%

🔹 No Setup Charges for Repeat Orders

Programming costs amortized across runs

🔹 Volume Flexibility

Same pricing from 10 to 10,000 units

Price Comparison Example:

Industry Standard: Aluminum aerospace bracket (5-axis, ±0.01mm tolerance)

$180-220/piece

Our Price:

$135-165/piece (qty 100+)

$145-180/piece (qty 10-50)

Transparent Quoting: Upload your CAD file—receive detailed quote within 4 hours with cost breakdown.

🔧 TECHNICAL ADVANTAGE: We Machine What Others Can't

Specialized in High-Difficulty Components:

Complex Geometries

  • Deep cavities with high aspect ratios (depth:width >10:1)
  • Compound angles and sculptured surfaces requiring 5-axis simultaneous machining
  • Undercuts and internal features inaccessible to 3-axis machines
  • Thin-wall structures (<0.5mm wall thickness) without deformation

Extreme Tolerances

  • Positional accuracy to ±0.003mm across 1000mm+ work envelopes
  • Flatness and parallelism to 0.005mm per 300mm
  • Surface finish to Ra 0.4μm directly off the machine
  • GD&T compliant: Profile, runout, concentricity verification

Difficult Materials

  • Titanium (Ti-6Al-4V): Aerospace implants, turbine blades
  • Inconel/Hastelloy: High-temp alloys for oil/gas
  • Hardened Steel (HRC 55-62): Direct machining of heat-treated components
  • Carbon Fiber Composites: Delamination-free machining
  • Medical-Grade Plastics: PEEK, Ultem, PTFE for biocompatible devices

Micro-Machining Capability

  • Features as small as Φ0.3mm holes with ±0.01mm position accuracy
  • Thread milling M1.0-M2.0 for miniature medical devices
  • Engraving and micro-texturing for optical components

Real Technical Challenge Solved:

Client Request: Titanium surgical implant with internal cooling channels, wall thickness 0.8mm, ±0.005mm tolerance, Ra 0.6μm finish

Competitors: 3 quotes declined ("too risky" / "requires EDM + hand finishing")

Our Solution: 5-axis HSM with custom toolpath strategy—delivered 50 pieces in 12 days, 100% pass rate

📊 Technical Specifications

Parameter Specification Competitive Edge
Work Envelope X1200 × Y800 × Z600mm Handles large aerospace/automotive parts
Spindle Speed 24,000 rpm (HSM option) 3× faster than standard 8,000 rpm machines
Tool Capacity 40-position ATC Fewer tool changes = 15% faster cycle times
Positioning Accuracy ±0.003mm Exceeds ISO 230-2 standards
5-Axis Configuration A-axis ±120° / C-axis 360° Full hemispherical access to complex parts
Rapid Traverse 60m/min (X/Y/Z) Minimizes non-cutting time
Coolant System High-pressure (70 bar) through-spindle Better chip evacuation in deep holes

🏭 Industries & Applications

🚗 Automotive

Turbocharger housings, differential components, custom engine brackets

Lead time: 7-10 days

⚕️ Medical Devices

Orthopedic implants, surgical instruments, MRI-compatible components

ISO 13485 | Lead time: 10-14 days

✈️ Aerospace

Landing gear components, turbine blades, structural brackets

AS9100D | Lead time: 14-21 days

🔌 Electronics

Heat sinks with micro-fin arrays, RF shielding enclosures

Lead time: 5-7 days

⚡ Energy

Valve bodies for high-pressure systems, downhole drilling components

Lead time: 10-15 days

🏭 Industrial Automation

Precision gears, robotic end-effectors, motion control housings

Lead time: 7-10 days

✅ Why Manufacturers Choose Us

Challenge Our Solution Your Benefit
"Lead time too long" 24/7 automation + parallel processing 50% faster delivery
"Price too high" Integrated turn-mill + optimized toolpaths 20-35% cost savings
"Part too complex" 5-axis + specialized tooling for hard materials We machine what others decline
"Need design help" Free DFM analysis before quoting Reduce manufacturing costs 15-30%
"Quality concerns" CMM inspection + full GD&T reports <0.5% rejection rate

📦 Complete Service Package

Engineering Support

Free DFM consultation to optimize your design

Material Sourcing

Direct relationships with suppliers—no markup

Quality Documentation

FAIR, CMM data, material certifications

Surface Treatments

Anodizing, passivation, heat treatment coordination

Global Shipping

DHL/FedEx express or consolidated sea freight

🎯 Get Started in 3 Steps

1

Upload CAD File

STEP, IGES, or native CAD formats accepted

2

Receive Quote

Detailed pricing + lead time within 4 hours

3

Approve & Produce

Parts shipped according to your schedule

📞 Ready to Solve Your Toughest Machining Challenge?

Engineering Inquiries: william.zuo1984@gmail.com

Certifications: ISO 9001:2015 | AS9100D | ISO 13485

"Precision engineering meets unmatched speed — delivering what others can't, when you need it most."

For more information about CCIG’s latest achievements and innovations, please stay tuned to our official website and follow our news updates.

Share: